Stainless panel interior before grooming the wires.
Fused disconnect, starter & controls in Nema 4 enclosure.
Interior of building automation interface relay panel w/ power supply & transducer.
Another interface panel under construction.
Rear of door with pushbotton switches and indicator lights.
Finsihed panel doors w/ phenolic labels attached.
Interior of pneumatic panel w/ switches wired to terminals.
These doors will be attached to the control panels & are headed for the Seton Hall Towers in downtown Newark.
Punching panel faces for gauges.