Lincoln Tunnel Photo Gallery

 

This three-year project spanned from 1989 to 1992.   A total of  70,000' of communication cable was installed from NJ to NY above roadway in the exhaust ducts.  From the main control room in NJ, communications was established with 11 locations in NJ and NY.  The purpose of this system was to monitor temperature, pressure, flow, status and control the pumps, valves and boilers, all components of the Fire Standpipe System.  Response time from when a command was given in NJ to when the action took place in NY was 2 seconds.

 

.

Motorized Valve